Application of IEC61850 in Condition Monitoring of Converter Station

Volume 6, Issue 1, February 2021     |     PP. 11-22      |     PDF (639 K)    |     Pub. Date: December 23, 2020
DOI:    184 Downloads     6303 Views  

Author(s)

Liu Yi, Xuchang Vocational Technical College, Xuchang, Henan 461000, China
Huang Hao-ran, XJ Electric Co. Ltd, Xuchang, Henan 461000, China
Rao Guo-hui, XJ Electric Co. Ltd, Xuchang, Henan 461000, China

Abstract
With the increasing of UHVDC transmission project in China, the design, operation management and equipment manufacturing of HVDC projects in China are also at the leading level in the world. However, the condition monitoring technology of converter station equipment in our country is developing slowly. Based on IEC61850 intelligent converter station equipment research, based on the more mature power transmission equipment status testing technology, based on the advanced computer technology, artificial intelligence technology, communication technology used in the converter station of the major equipment State maintenance, the power sector to achieve equipment maintenance gradually by the state inspection and maintenance overhaul. In this way, power grid companies can not only ensure the safe and reliable operation of electrical equipment, but also get the maximum economic and social benefits. So that the traditional sense of the monitoring system is transferred from independent transition to a networked, integrated and intelligent monitoring system.

Keywords
HVDC transmission; IEC61850; equipment state monitoring; intelligent control

Cite this paper
Liu Yi, Huang Hao-ran, Rao Guo-hui, Application of IEC61850 in Condition Monitoring of Converter Station , SCIREA Journal of Electrical Engineering. Volume 6, Issue 1, February 2021 | PP. 11-22.

References

[ 1 ] Chen Haibo, Zhou Jianguo, Li Honglei, Bowei. Research on digital substation based on equipment state information technology [J]. East China electric power, 2008,36 (11): 5-7.
[ 2 ] Liu Li. Research on the improvement of substation automation monitoring system [D]. Nanjing University of Posts and Telecommunications, 2015.
[ 3 ] Liu Yi, Zhao Ya-tao, Huang Hao-ran ,Advanced Materials Research,HMI Engineering software automation in UHVDC transmission project of design and Implementation,2013.11.9.
[ 4 ] Yin Jiafan, Wang Sunan, shengwan Xing.XML language in the application of [J]. computer engineering and application of substation equipment description, 2003 (21): 209-210+224.
[ 5 ] Zhao Han, Chang Hong, Liu Xiaohui, Chen de. The SSD file generation algorithm in the system description tool based on IEC61850, [J]. electrical energy new technology, 2010,29 (01): 67-70.
[ 6 ] Zhang pan. Research on IEC 61850 information access in substation monitoring and control system [D]. North China Electric Power University (Beijing), 2008.
[ 7 ] SHI Yan,HAN Wei,ZHANG Min,WANG Qing A Preliminary Scheme fro Control and Protection System of UHVDC Project.Power system Technology, 2007,31(2).Y. Yorozu, M. Hirano, K. Oka, and Y. Tagawa, “Electron spectroscopy studies on magneto-optical media and plastic substrate interface,” ASME Transl. J. Magn. Japan, vol. 2, pp. 740–741, August 1987 [Digests 9th Annual Conf. Magnetics Japan, p. 301, 1982].
[ 8 ] Li Jian. Maintenance and maintenance of one equipment in hydroelectric power plant and maintenance of [J]. technology information, 2008 (26): 155.
[ 9 ] Ren Chunming, Liu Feng. Status and improvement of preventive test and maintenance of power equipment and improvement recommendations [J]. mechanical management development, 2009,24 (06):
[ 10 ] Chen Zhi-Wei Research on IEC 61850-Based Communication Technology for Distribution Automation[j] ]2012